Lion’s Jubilee Park, Port Augusta SA

Albert Johns Hair Dressing website design

The completion of our inaugural 3 cubicle Modular building marks a significant milestone for our organization, especially as it is the first of its kind in South Australia. This structure has been meticulously designed to comply with Disability Discrimination Act (DDA) standards, ensuring accessibility and inclusivity for all individuals.

In response to the specific requirements outlined, our focus was on delivering a cost-effective, robust facility within a tight timeline, with the goal of installation before the end of the financial year (EOFY). The project demanded a careful balance of efficiency, quality, and adherence to regulatory standards, making it a testament to our commitment to meeting client needs.

One notable adaptation to the project was the substitution of steel members with aluminium throughout the construction. This decision was prompted by the coastal environment in which the building is situated. The corrosive nature of coastal air and the potential for accelerated deterioration of steel components led us to choose aluminium, a corrosion-resistant material. This strategic shift not only enhances the durability of the structure but also underscores our dedication to sustainable and resilient construction practices.

Our team approached this project with a keen awareness of the environmental factors at play, ensuring that every element of the building was selected and implemented with the utmost consideration for its longevity and performance. The result is a state-of-the-art modular building that not only meets but exceeds the expectations of our clients in terms of functionality, accessibility, and longevity.

This successful venture serves as a testament to our expertise in delivering tailored solutions that marry innovation with practicality. We are proud to have pioneered such a cutting-edge facility in South Australia and are confident that it will serve as a benchmark for future projects in the region. As we celebrate the completion of this project, we look forward to continuing our commitment to excellence and pushing the boundaries of modular construction in the pursuit of creating spaces that stand the test of time.

  • Optional extras chosen:
    • Hand Dryers – all cubicles
    • External Modwood cladding
    • Insulated roof panels
    • Aluminium roof frame and door jambs
    • Aluminium doors
  • Works included:
    • Services disconnect and demolition of existing toilet building
    • Site preparation/earthworks for new building
    • Building and privacy screen column install
    • Services reconnect and power upgrade
    • Perimeter paving (concrete)
    • Landscaping
  • Local contractors/businesses utilised:
    • Phillip Brown Electrical
    • Bury Plumbing
    • PA & CI Martin Civil
    • Max Services – Crane hire
    • Thiele's Fabrication & Renovations - perimeter paving

A Big Thank You to:

A heartfelt expression of gratitude extends to all the dedicated individuals and organizations who played pivotal roles in the realization of our 3 cubicle Modular building project in South Australia. Your unwavering support and collaboration have been instrumental in transforming our vision into a tangible, functional reality.

First and foremost, our sincere thanks go to the Port Augusta City Council for their proactive engagement and support throughout the entire process. Their commitment to facilitating community development and their collaborative spirit have been indispensable in navigating the regulatory landscape and ensuring a smooth progression of the project.

The Lion's Club Port Augusta, with their community-centric ethos, deserves special recognition for their invaluable contributions. Their involvement has not only added a layer of community support but has also demonstrated the power of collective effort in achieving shared goals. The Lion's Club has been a true partner in fostering positive change within the local community.

A resounding appreciation is extended to the local contractors who lent their expertise and craftsmanship to the project. Their commitment to excellence, attention to detail, and adherence to project timelines have been commendable. Their dedication reflects not only in the final product but also in the seamless execution of each phase of the construction process.

Enviro Dome's Contractors, including Laser Electrical, Aaron Mills Plumbing, Krautz and Summerill for precast concrete, and Lieschke Transport Pty. Ltd., deserve special mention for their specialized contributions. The collaboration with these contractors has been characterized by professionalism, efficiency, and a shared commitment to the project's success. Each entity has brought a unique skill set to the table, contributing to the overall quality and functionality of the modular building.

In particular, the precision and expertise demonstrated by Laser Electrical, the plumbing proficiency exhibited by Aaron Mills Plumbing, the excellence in precast concrete work by Krautz and Summerill, and the efficient transport solutions provided by Lieschke Transport Pty. Ltd. have significantly elevated the project's outcomes.

This collaborative effort exemplifies the power of synergy, where diverse talents and capabilities come together to create something truly exceptional. As we express our gratitude, we also recognize that it is through such partnerships that we are able to exceed expectations and set new benchmarks in the realm of construction.

Once again, thank you to each and every individual and organization involved in this project. Your contributions have not only enriched the built environment but have also strengthened the bonds within the community. We look forward to the continued success of our collaborative endeavors in the future.

Before

lions jubilee park 1

After

lions jubilee park port augusta 49
lions jubilee park port augusta 48